Plug In Your Building

Access industry leading expertise through every phase of your charging station install!
  • Make Your Residence EV Friendly
  • Canada’s most intuitive Multi-unit Residential EV Charger, on Burlington’s future-focused EV Network
  • Support your EV driving residents and attract new buyers!

Why Plug into the Future Grid?

Equip your residence with leading-edge, Canadian-made, intelligent charging stations that run on Burlington’s future focused EV charging network.

Give your tenants the confidence in knowing that they reside in a residence that has chosen to be aligned with the city’s premier charging system, utilizing charging station technology installed and monitored by Burlington Electricity Services Inc.

Provide turn-key charging that can be installed in the parking lot or garage. Chargers can be connected to the main meter for general use or in dedicated parking spots with individual metering – EV owners only pay for the electricity they use.

Allow residents to benefit from technology that features built in security and protection from power surges.

Option 1: The EV Chargers can be connected to the main meter for general or visitor use

Option 2: The EV Chargers can be connected to individual meters
and billed to condo suites, so EV drivers only pay for the energy they consume

Condominium Act, 2018

Ontario Regulation 48/01
Electric Vehicle Charging Systems

The Condominium Authority of Ontario (CAO) changed regulations of electric vehicle charging systems (EVSE), May 1, 2018 introducing a new EVSE installation approval process for obtaining approval to install EVSE’s in condominium buildings.

Step 1: Written application, by owner to the corporation, including drawings, and specifications.

Step 2: Decision, the corporation has 60 days to respond to the submission. If declined, qualified personnel must provide adequate documentation and reasoning to prove the installation of EV chargers would pose a serious health and safety risk.

Step 3:  Agreement, once the application is accepted, the owner and the corporation have 90 days to enter into a written agreement. Unless agreed otherwise, the owner is responsible for all installation costs.

For more information on the Condominium Act visit https://www.plugndrive.ca/condo-charging

7 GREAT REASONS

to make your Condominium EV-ready

9

1.  EV owners want to reside in Condominiums that have made the conscious choice to meet the needs of EV drivers today and for years to come.

9

2. Equip your condominium with leading charging station technology

9

3.  If left unchecked, the cumulative demand will force the on-site electrical service and transformer to operate beyond capacity, leading to outages. We will ensure that doesn’t happen.

9

4.  Show your sustainability and environmental commitment by taking the lead on EV Charging and earn up to three LEEP points from the Green Building Council

9

5.  Allow us to manage the load of your residents EV’s so more cars can be charged simultaneously at a cheaper price

9

6.  Burlington Electricity Services Inc. has partnered with industry leaders to create a flexible solution for this increasing demand as the Building Code looks to mandate EV charging accommodations.

9

7.  Our model optimizes charging periods based on parking and driving habits of EV owners, to help size the electrical service to the building and allow for future growth.

CHARGING EFFICIENCY COMPARISON

UNMANAGED

MANAGED WITH EV FUTUREGRID OPTIMIZATION

Charging Station Features

  • CSA Certification
  • 100 % Aluminum NEMA 4x Certification
  • 25 ft ultra-flex cable from -40 to 50 ℃
  • Integrated safety features
  • Indoor or outdoor installation
  • Energy management features
  • Automatic software updates
  • Free CAA 24-hour emergency response for EV charging stations

The EV Future Grid is Burlington’s premier EV Charging Station Network, backed by the engineering expertise of Burlington Electricity Services Inc. The network plugs-in individual EV owners, qualifying multi-residential developers, municipal facilities, selected employers, and longer term, other public places. Several leading-edge industry partners are engaged.

Services BESI offers to owners and boards
to prepare for EVSE requests

SERVICES BESI OFFERS TO OWNERS AND BOARDS TO PREPARE FOR EVSE REQUESTS

FREE HIGH LEVEL LOAD REPORT

INCLUDES …

  • Transformer capacity feeding the building, including, primary and secondary voltages
  • Monthly load peaks for previous 3 years
  • Rough estimate on EVSE numbers and capacity (note: Our detailed electrical report is required to determine actual EVSE numbers available within the building)
  • Written summary report

DETAILED ELECTRICAL REPORT FOR ADDITIONAL FEE*

INCLUDES …

      • Transformer capacity feeding the building, including, primary and secondary voltages
      • Monthly load peaks for previous 3 years
      • Review of electrical drawings, supplied by building owner or condo board
      • Site visit by electrical engineer, meter manager and electrician, to determine capacity of existing electrical equipment
      • Confirmation of design with ESA, if required
      • Design and Pricing for electrical room equipment, metering equipment, and electrical supply points within parking garage
      • Data logger load testing, if required
      • Detailed written report

 *Applied to future EVSE installation

Call 905-332-1851 EXT 251 for pricing and details